Rotterdam Shore Power (RSP) - Shore Power Infrastructure for Deep-sea Container Terminals

Rotterdam, Netherlands · 2025 · Rotterdam Shore Power (RSP) — joint venture between Port of Rotterdam Authority and Eneco, with engineering and construction by ABB

The project significantly reduces dependence on fossil fuels at Europe's largest container port. It also prepares Rotterdam for compliance with the FuelEU Maritime Regulation, which will require large vessels to use shore-side electricity while berthed from 2030 onwards. Additional impacts include: Improved air quality. Elimination of noise pollution during port operations. Better working and living conditions in port areas. Increased energy independence through reduced dependence on imported fossil fuels. Strong public acceptance due to direct health and environmental benefits.

Highlight

Direct industrial electrification at the Port of Rotterdam, enabling deep-sea container ships to switch off auxiliary engines while berthed and significantly reducing emissions at Europe's largest container port.

Extended description

The Shore Power Infrastructure project consists of the large-scale installation of electrical connection systems enabling deep-sea container ships to connect to the local electricity network while alongside the quay.

This allows vessels to switch off their auxiliary engines during port operations, eliminating direct emissions of CO₂, nitrogen oxides, particulate matter and noise while berthed.

The project is being implemented through Rotterdam Shore Power (RSP), a joint venture between the Port of Rotterdam Authority and the energy company Eneco.

ABB has been selected as the engineering, procurement, construction and maintenance partner responsible for delivering the electrical infrastructure.

The project is supported financially by the European Investment Bank (EIB) and the European Commission through the Connecting Europe Facility (CEF).

The solution is considered unique because of its global scale and its capacity to simultaneously serve three of the largest container terminals in the Port of Rotterdam:

The system incorporates advanced SCADA control systems for energy monitoring, billing management and integration with renewable electricity sources.

The project also represents a large-scale public-private partnership supported by substantial international financing and aligned with upcoming European maritime regulations.

Demonstrated metrics

Real impact

The project significantly reduces dependence on fossil fuels at Europe's largest container port.

It also prepares Rotterdam for compliance with the FuelEU Maritime Regulation, which will require large vessels to use shore-side electricity while berthed from 2030 onwards.

Additional impacts include:

Implementation location & date

Port of Rotterdam, Netherlands

Locations:

Timeline:

Comparable initiatives:

- Collaboration between Rotterdam and Singapore on Green & Digital Shipping Corridors.

Similar cases elsewhere

Comparable initiatives include:

The solution is highly replicable thanks to its prefabricated, scalable design, which minimizes operational disruption during installation.

Positive Co-benefits

Environmental & Social

Economic

Challenges

Additional Information

Why is it different?

Why has it worked?

Sources